23/4588

The construction of a dwelling house, the construction of a private on-site wastewater treatment system and all associated site works

Refused

Core Refusal Reason

Failure to demonstrate a genuine rural housing need in a Stronger Rural Area and significant traffic safety concerns regarding road capacity and sight lines.

Decision Maker's Conclusion

  • The applicant failed to demonstrate a genuine rural-generated housing need based on social or economic links to the local area as required for a Stronger Rural Area under Objective RP 5-6.
  • The existing road network is considered inadequate to safely accommodate the additional traffic movements likely to be generated by the proposed development.
  • The restricted road frontage of the site precludes the provision of satisfactory sight lines at the proposed entrance, creating a public safety risk.

Cited Policies (CDP)

RP 5-6County Development Plan 2022

Decision Document Summary

The proposal involved the construction of a dwelling house and a private on-site wastewater treatment system at Ballygrace, Churchtown, Mallow, Co. Cork. The site is located within an area designated as a 'Stronger Rural Area' in the Cork County Development Plan 2022. The Planning Authority refused permission because the applicant did not establish a functional or social need to reside in this specific rural locality. Furthermore, the development was deemed contrary to public safety due to the s...