23/5157

(1) The construction of an advanced domestic wastewater treatment system replacing the existing septic tank and soakaway, (2) The retention of the front elevation of the dwelling house as constructed, (3) The retention of altered site boundaries, (4) All associated site works.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.