23/5947

The proposed development will consist of; 1) the construction of a stationary battery energy storage system which will include 154 no. 20ft. containers and 22 no. medium voltage transformers and connection to the existing substation, 2) the construction of a new internal access road, to connect to an internal road previously permitted under application register reference: 19/6783, which will connect to an existing internal road on the Marino Point site, with access from an existing entrance on the R624, 3) heating, ventilation and air condition units and all other associated site, boundary and development works. A Natura Impact Statement has been prepared in respect of the proposed development and will be submitted to the planning authority with this application.

Refused

Core Refusal Reason

The proposal constitutes a highly vulnerable use in a high-risk flood zone and fails to comply with the port-related industrial zoning objectives for the site.

Decision Maker's Conclusion

  • The development is located within flood zones A and B and failed the Development Management Justification Test and sequential approach required for highly vulnerable uses.
  • The proposed use is not considered a specific port-related activity, resulting in a material contravention of the Special Policy Area objective X-01 of the Cork County Development Plan 2022.
  • The proposal would set an undesirable precedent for non-port-related developments in the vicinity and is considered prejudicial to public health and sustainable development.

Cited Policies (CDP)

WM 11-14WM 11-15WM 11-16WM 11-17X-01

Decision Document Summary

The application sought permission for the construction of a stationary facility at the Belvelly Port Facility, Marino Point, Cobh. The site is located within a designated Special Policy Area reserved for port-related industrial development and is situated in an area susceptible to flooding (Zones A and B). The Planning Authority refused the application because the development failed to justify its location in a flood-risk area and did not qualify as a port-related activity, thereby materially co...