The development will consist of an application for a 10-year planning permission for the construction of, and 40-year operation and subsequent decommissioning of, a development consisting of a 92.75-hectare solar farm and underground grid connection route (red line boundary). The underground grid connection route will run underneath private lands and L5527, L5528 and L5529 public roads for 1km where it will connect the proposed development to the previously consented electricity grid interconnector (Cork County Council Pl. Ref 22/5933). The solar farm comprises of four separate land parcels divided by local roads. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas concrete shoes to protect possible underground archaeological features, together with electrical transformation enclosures, underground cabling, temporary construction compounds, the use of existing farm access tracks, existing site entrances, widening of 1 No. existing site entrance, inverters, CCTV poles and cameras, deer type security/boundary fencing with some areas of boundary development on concrete shoes to further protect possible underground archaeological features, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity and transmitting it. A Natura Impact Statement will also be submitted to the Planning authority with this application.

Granted

Core Planning Reasoning

The Inspector recommended a grant of permission, concluding that the proposal aligns with national and regional renewable energy targets and that potential impacts on ecology, landscape, and road safety can be successfully mitigated through conditional compliance and revised design layouts.

Decision Maker's Conclusion

  • The development is consistent with the National Planning Framework and the Cork County Development Plan 2022-2028, making a positive contribution to Ireland's renewable energy and security of supply requirements.
  • Following an Appropriate Assessment, it was determined that the mitigation measures provided in the Natura Impact Statement (NIS) ensure the project will not adversely affect the integrity of the Blackwater River SAC or the Kilcolman Bog SPA.
  • The proposal, as amended by further information, will not seriously injure the visual or residential amenities of the area, nor will it prejudice the future delivery of the N/M20 Cork to Limerick road project.

Cited Policies (CDP)

Objective ET 13-1 (Energy)Objective ET 13-14 (Solar Farm Development)Objective ET 13-21 (Electricity Network)Objective EC: 8-15 (Agriculture and Farm Diversification)Objective BE 15-6 (Biodiversity and New Development)Objective BE 15-2 (Protected sites, habitats and species)Objective HE 16-9 (Archaeology and infrastructure)Section 14.7 (Landscape)Objective GI 14-3 (Green Infrastructure)Objective GI 14-9 (Landscape)Objective GI 14-10 (Draft Landscape Strategy)Objective BE 15-13 (Noise and light emissions)

Decision Document Summary

The proposal involves a 10-year planning permission for a solar PV farm on a 92.75-hectare site near Charleville, Co. Cork, with a 40-year operational life and a 3.5km underground grid connection. The site consists of four parcels of agricultural land currently used for pasture and tillage. Key issues addressed in the report include the potential impact on the Kilcolman Bog SPA (specifically Whooper Swans), the proximity to the proposed M/N20 motorway study corridor, and third-party concerns reg...