23/6540

Permission for the construction of a residential development consisting of 77 no. dwelling houses and a single storey creche facility with ancillary surface car park, bicycle parking racks, bin stores and all ancillary development works. The proposed development consists of the construction of 7 no. 4 bedroom detached/semi-detached dwelling houses, 38 no. 3 bedroom semi-detached/townhouse units and 32 no. 2 bedroom townhouse units. Vehicular and pedestrian access to the proposed development will be provided from the Cork Road (L-2040) to the west with a pedestrian link also provided from the Ard an Chuilinn residential development to the northeast of the site. The proposed development provides for undergrounding of a section of the Bandon-Ballincollig-Timoleague 38kV overhead line, including associated provision of a steel lattice mast structure. Ancillary site development works include landscaping and water, wastewater and surface water servicing proposals.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.