3730/24

PROTECTED STRUCTURE : The development will consist of removal of the failing pointing and to fully wig point and repair the brick elevation at first and second floor levels and repair the flush pointing at granite basement level. The side gable is to be fully repaired and flush pointed. Only traditional lime mortars to be used throughout.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.

PDF Document Missing

The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.