24/6273
Permission for the construction of a high-power electric vehicle charging station consisting of 24 no. electric vehicle charging bays and all associated ancillary development including 2 no. electricity sub-stations, 24 no. power supply cabinets, pedestrian access, boundary treatments, landscaping and seating area at the Circle K service station. Vehicular access will be via the existing access and roundabout serving the existing Circle K motorway station. A Natura Impact Statement has been submitted to the planning authority with the application.
Core Refusal Reason
The proposed development encroaches into the designated Town Greenbelt, materially contravening policy objectives intended to preserve the distinction between built-up areas and the open countryside.
Decision Maker's Conclusion
- The development would result in the loss of land designated as 'Town Greenbelt 1-1', which is reserved for agriculture, open space, or recreation uses.
- The proposal materially contravenes Policy Objective RP 5-19 of the Cork County Development Plan by eroding the greenbelt and the character distinction between Fermoy and the open countryside.
- Granting permission would set an undesirable precedent for similar encroachments into protected greenbelt areas, contrary to the proper planning and sustainable development of the area.