24/6453
Permission for the development will consist of continued use of the existing permitted quarry, ancillary processing plant and facilities, and access beyond 2034 (the existing permitted duration); lateral extension of the existing permitted quarry area to a depth of c.110mOD ( the permitted quarry floor level in the existing quarry) over c.3.7 hectares; construction of a new settlement pond (1000m²) and upgrade of the existing surface water management and settlement pond system at site; realignment of a section of the existing local road to the south of the proposed extension area; overburden storage; operation landscaping including perimeter screening berms around the proposed extension area; restoration of the quarry to natural habitat after-uses; and all related ancillary site works within an overall application area of c.28.8 hectares, all for a period of 20 years and a further 2 years to complete final restoration of the site. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS).
Core Refusal Reason
Traffic hazard due to substandard road realignment design.
Decision Maker's Conclusion
- The applicant failed to demonstrate that the proposed realignment of the local road to the south of the extension area was designed to an appropriate standard.
- The proposed development would endanger public safety by reason of a traffic hazard.
- The proposal is contrary to the proper planning and sustainable development of the area.