25/4167
10 Year Planning permission for a solar farm with a total area of circa 9 hectares. The solar farm will consist of solar panels on ground mounted frames, 2 no. single storey electrical inverter/transformer stations, 2 no. containerised energy storage modules, 1 no. single storey spare parts container, 1 no. medium voltage control/switching substation (comprising either single-storey building or 2 no. modular units), 1 no. weather station, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 1 no. existing entrance from the L7247. The operational lifespan of the solar farm will be 40 years and planning permission is requested for the duration.
Core Planning Reasoning
The Inspector recommends a grant of permission as the development is consistent with national and regional policies supporting the transition to a low-carbon economy and renewable energy targets. Furthermore, the Inspector determined that the site's 'Medium' landscape sensitivity can absorb the proposal without significant adverse visual or residential amenity impacts, provided mitigation measures and conditions are implemented.
Decision Maker's Conclusion
- The proposed solar farm aligns with the National Planning Framework (NPF) and Climate Action Plan objectives to reach 8GW of solar power by 2030, justifying the principle of development at this rural location.
- The residential amenity of nearby dwellings, specifically the third-party appellant, is protected by a substantial setback of over 200m and proposed high-quality native hedgerow screening which will mitigate visual intrusion and noise.
- Potential environmental and technical risks regarding archaeology (a detected ring-ditch), glint and glare, and surface water runoff have been sufficiently mitigated through layout revisions and specific planning conditions requiring pre-development testing and sustainable drainage (SuDS).