25/5128

Permission for upgrade works at the Freemount Water Treatment Plant (WTP). The development will consist of the following: Coagulation, Flocculation and Clarification: Upgrade of poly aluminium chloride (PACI) chemical delivery area, with concrete road sloped to a new drainage gully and dedicated spill tank to contain any potential chemical spills during the delivery process. Disinfection: Install an outdoor bunded chlorine bulk storage tank with a capacity of 2m3 equipped with chemical dosing cabinet. New emergency shower and chemical delivery area for spill containment, new drainage gully connected to dedicated underground spill tank. WTP Residuals: Decommissioning of the existing residual tanks. Refurbishment of the existing used wash water equalization tank (UWWET), including installation of 1 No. mixer and pump replacement. New backwash pump kiosk housing the new backwash pumps and upgraded residuals treatment MCC panel. Installation of 1 No. new 119m3 sludge settlement tank. Installation of a UWWET pumping station. Installation of 1 No. new 16m3 sludge balance tank including for recirculation pumps. Installation of sludge balancing pumping station. Installation of 1 No. new 24m3 picket fence thickener. Installation of a sludge holding tank feed pumping station. Installation of 1 No. new 82m3 sludge holding tank with facility for off-site tankering connection. Ancillary Works: Installation of manholes, access chambers, instrumentation, monitoring equipment & controls in accordance with Uisce Eireann’s technical standards. General groundworks, surfacing, landscaping, ducting, drainage and pipe work associated with the proposed works described above. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.