25/6672

Permission for the construction of new shared sports facility. The proposed development includes the provision of. (a) 7 no. playing pitches comprising 3 no. grassed rugby pitches (pitches no’s 1, 2 & 3), 2 no. grassed soccer pitches (pitches no’s 5 & 7), 1 no. astroturf/all-weather soccer pitch (pitch no. 4) and 1 no. astroturf/all-weather multi-use pitch (pitch no. 6). (b) The construction of 2 no. two-storey clubhouse buildings providing changing rooms, player and spectator welfare facilities with adjacent surface car and bicycle parking areas. (c) The provision floodlights of circa 15-21 metres in height, serving pitch no’s 1, 2, 3, 4 and 6. (d) The provision of 2 no. on-site wastewater treatment units with ancillary polishing filters to serve the proposed development. (e) The extension of the public footpath network along Kennel Hill (L-1203) to connect with the permitted footpath network in the ‘Rose Hill’ residential development permitted by An Bord Pleanála reference 312640-22, which is currently under construction. (f) The undergrounding/diversion of existing 10KV and 38KV overhead lines which traverse the site. (g) All other ancillary site development works including landscaping/compensatory planting and SuDS proposals. (h) Vehicular access to the proposed development will be provided via a shared site entrance from Kennel Hill (L-1203) with an additional pedestrian entrance to the southeast of the site also from Kennel Hill (L-1203). A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.