WEB1171/26
Permission for rear extensions and internal reconfiguration at the Hilton Garden Inn Hotel, resulting in a net gain of 66 no. bedrooms and 2,279 sq.m of floor area. The development will consist of a first to seventh floor middle rear extension; a second to sixth floor rear extension at western end; internal alterations to existing room layouts; the reduction in size of existing water tank, demolition and reconstruction of the existing pump room and reincorporation into middle rear extension; the extension of the existing chiller compound and addition of stairwell and lift at ground floor level; Sustainable Drainage Systems (SuDS) measures, including a green roof; and site services.
Decision Document Summary
No text availablePDF Document Missing
The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.