WEB1778/26
We, Beaumont Hospital, intend to apply for permission for the development at this site, Beaumont Hospital, Beaumont Road, Dublin 9. The development will consist of a new two storey modular Genome Laboratory. Ground floor includes Lobby, Reception, Hall, Store, Stairs, Dis WC, Freezer and Laboratory. First floor includes Office 1, Office 2, WC, Store, 4 Persons Office. The gross floor area of the building will be 179.4m2. The works will also include connection into the existing sewer system, new drainage as required and associated site works with reconfiguration of ramp/steps. The building will be located on the site of Beaumont Hospital, north west of the boiler house and south of the maintenance building.
Decision Document Summary
No text availablePDF Document Missing
The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.