2660953

(1) RETENTION OF SEPTIC TANK AND PERCOLATION AREA AND (2) RENOVATION AND EXTENSION OF EXISTING ONE AND HALF STOREY DWELLING TO INCLUDE SPLIT LEVEL EXTENSION TO REAR, CHANGE OF EXISTING ROOF MATERIAL AND ALL ASSOCIATED SITE WORKS

CONDITIONAL
Analysis not available for this case.

Inspector's Report Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.