(1) RETENTION OF DEMOLITION OF THE ATTACHED SHED TO THE SIDE OF EXISTING DWELLING AND (2) CONSTRUCTION OF AN EXTENSION TO THE SIDE OF THE DWELLING, OF THE SAME FOOTPRINT