2561032

(1) DEMOLITION OF EXISTING SIDE AND REAR EXTENSION, (2) RENOVATIONS AND CONSTRUCTION OF EXTENSIONS TO THE REAR AND SIDE OF THE EXISTING DWELLING, (3) ERECTION OF A DETACHED SHED, (4) CONSTRUCTION OF A NEW FRONT ENTRANCE, (5) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA AND (6) AND ALL ASSOCIATED WORKS

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.