SD23A/0335

Expansion of the existing National Basketball Arena by means of the demolition of the existing structure for the construction of a new multi-functional facility comprising of, main hail sized to allow for 4 full size basketball courts; Deployable seating for a FIBA International Rated basketball court with a capacity for 3272 spectators; all with changing and sanitary facilities to match; Entrance Foyer with access to ancillary café/shops; sports' governing-body offices; Corporate facilities with 1st floor roof terrace and with related kitchen; Gym; staff areas, and associated storage & maintenance facilities; This is to be housed in a part single! part two storey/part three storey structure with a gross internal area of c.7913.3 sq.m, with a projecting canopy along North and East elevations; The Main Hall has a gross floor area of c.2,934 sq.m designed to flexibly accommodate a range of activities/sports; The overall primary dimensions of the proposed structure are c.89m by c.59m (with various projections/ recesses) and a primary height of c.12.70m. (with variations down to c 5.50m); Permission is also sought for carpark area with 260 staff and visitor car parking spaces; Coach parking; bicycle parking; ancillary services area; drainage works; landscaping works including paving, planting, earth mounding, and SuDs; Canopy mounted signage and associated site development works on a site area of 1.713 Ha.

Split decision

Core Reason for the Refused Part

Refusal of non-sporting uses due to potential traffic hazards, inadequate junction capacity at Castletymon Road, and insufficient assessment of trip generation for large-scale events.

Decision Maker's Conclusion

  • The intensification of use for non-sporting events such as exams, concerts, and conferences would likely result in a traffic hazard due to the limited capacity of the existing junction at Castletymon Road to cater for such volumes.
  • The applicant failed to comply with procedural requirements regarding site notices, failing to adequately inform the public of the proposed development at key access points to Tymon Park.
  • The proposal lacks sufficient detail and mitigation strategies regarding sustainable transport infrastructure, ecological protection for protected species (bats and badgers), and mandatory Green Space Factor (GSF) scoring.

Cited Policies (CDP)

Table 12.25Table 12.23GI5 Objective 4Figure 4.4 Green Infrastructure Strategy MapSouth Dublin County Council Development Plan 2022-2028

Decision Document Summary

The proposal involves the expansion of the National Basketball Arena in Tymon Park, Dublin 24, through demolition and new construction to create a multi-functional facility. While the sporting expansion was generally supported, the Planning Authority issued a split decision, refusing permission for non-sporting uses like exams and concerts. This refusal was primarily based on concerns that these events would generate unsustainable traffic levels and create hazards at local junctions. Additionall...