4315/24
PROTECTED STRUCTURE The development will consist of the refurbishment, services upgrade and re- ordering of the church interior, a protected structure. Works include removal of existing floor slab, floor finishes and building services, upgrade of life safety systems and M&E services; new stone predella with access ramp, altar & lecterns, fixed seating; new floor slab and floor finishes with underfloor heating, new access ramps; reinstatement of stained glass window, new room with glazed screens; new tea station and accessible WC and lobby using existing drainage; pews and railings refurbished; surplus pews put in storage; repository relocated, new protective glazing to stained glass windows; new handrails to sanctuary; general cleaning and redecoration of surfaces; miscellaneous conservation repairs.
Decision Document Summary
No text availablePDF Document Missing
The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.