2460197

A TEN-YEAR PERMISSION FOR A GRID SERVICES FACILITY COMPRISING OF (1) AN ENCLOSED BATTERY ENERGY STORAGE SYSTEM COMPOUND CONTAINING BATTERY ENERGY STORAGE CONTAINERS, ELECTRICAL INVERTERS, TRANSFORMERS AND POWER CONTROL CENTRES, (2) AN ENCLOSED SYNCHRONOUS CONDENSER COMPOUND CONTAINING A HORIZONTAL SYNCHRONOUS GENERATOR HOUSED WITHIN A SYNCHRONOUS CONDENSER BUILDING AND ANCILLARY INFRASTRUCTURE INCLUDING A FLYWHEEL, TRANSFORMER, CIRCUIT BREAKER AND COOLING EQUIPMENT, (3) UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING, (4) SITE ENTRANCE FROM THE L7965-1 LOCAL ROAD, (5) ON-SITE ACCESS TRACK, (6) SECURITY FENCING AND SECURITY GATES, (7) POLE-MOUNTED SECURITY CAMERAS, (8) ALL ASSOCIATED AND ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFETIME OF THE PROPOSED DEVELOPMENT IS 35 YEARS. THIS PLANNING APPLICATION IS ACCOMPANIED BY AN APPROPRIATE ASSESSMENT SCREENING REPORT

Refused
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.