SD24A/0225
The Proposed Development will consist of a high power electric vehicle charging points and associated infrastructure consisting of the following. 1. installation of 6no. electric vehicle charging bays, 3no. charging units & CT Metering Cabinet, 2. erection of associated signage, 3 Revision to existing pavement area through the removal of desisting automatic car wash & air/water services unit & all associated site development works including drainage infrastructure and line marking
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.