REPOSITIONING OF A SECTION OF THE EXISTING 38KV LINE KNOWN AS THE CARK-CULLIAGH 38KV LINE CONSISTING OF INSTALLATION OF 8 NEW STRUCTURES. THE AFFECTED LINE SECTION IS 700M