(1) ALTERATION OF THE PERMITTED RIDGE HEIGHT AND CONVERSION OF THE ATTIC AREA INTO HABITABLE SPACE INCORPORATING ROOFLIGHTS TO THE FRONT AND REAR ELEVATIONS AND (2) RELOCATION OF SEPTIC TANK SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS