INCREASING THROUGHPUT TONNAGE AT EXISTING FACILITY TO 20,000 TONNES PER ANNUM, NO OTHER CHANGES ARE PROPOSED. A REVIEWED WASTE FACILITY PERMIT WILL BE REQUIRED