SD24A/0134W
To erect photovoltaic panels on a ground mounted system with a 7.37 MWp on 35,243.81 sqm of the land located to the south of the existing Roadstone quarry facility, Cookstown Road, Dublin 24, D24 PKK2. The electricity generated will be used by the Roadstone site. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; using all temporary ways and temporary construction compound / set-down area provided by Roadstone Limited
Granted
Analysis not available for this case.