(1) CONSTRUCTION OF AN EXTENSION TO EXISTING HOUSE, (2) ALTERATIONS TO THE ELEVATIONS OF THE EXISTING HOUSE, (3) INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS