2460575

DEVELOPMENT OF A NEW SEWERAGE PUMPING STATION, RISING MAIN AND GRAVITY SEWER CONSISTING OF: (A) TYPICAL UNDERGROUND STORAGE CHAMBER/TANK, (B) ABOVE GROUND CONTROL KIOSK, MOTOR CONTROL CENTRE (MCC) KIOSK AND WASH WATER KIOSK, (C) TELEMETRY POLE (MAXIMUM 6M IN HEIGHT), (D) PERIMETER PALADIN FENCING (2.4M IN HEIGHT), (E) ACCESS ROAD (4M WIDE) AND INTERNAL VEHICULAR TURNING AREA, (F) WET WELL CHAMBER (27M³), (G) PASSIVE ACTIVATED CARBON FILTERS OVER THE WET WELL CHAMBER FOR VENTILATION, (H) RISING MAIN (APPROXIMATELY 160M IN LENGTH), (I) INLET SEWER, (J) EMERGENCY STORAGE AND OVERFLOW, INCLUDING A NEW HEADWALL AT ST. JOHNSTON STREAM, (K) INLET, WET WELL, VALVE CHAMBERS, AND METER CHAMBER, (L) LIGHTING AND WELFARE FACILITIES. THE PROPOSED DEVELOPMENT WILL SPAN AN AREA OF APPROXIMATELY 2216M2. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.