(1) ALTERATIONS TO EXISTING BUILDING INCLUDING RAISING THE HEIGHT OF EAVES AND RIDGE OF EXISTING BUILDING, (2) CONSTRUCTION OF EXTENSION TO THE REAR AND SIDE OF EXISTING BUILDING AND (3) INSTALLATION OF NEW WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS