24528

upgrade works including repurposing of tanks, relocation of equipment and repurposing construction/installation of tanks, upgrade to UV reactor, addition of a THM stripper and upgrade of Motor Control Centre, modifications to pumps pipework and intakes and associated engineering works. Works will also include modifications to onsite storage areas and installation of a new Programmable Logic Controllers (PLC) and Human Machine Interface (HMI) screens. All works will be conducted within the existing GWS site

Granted
Analysis not available for this case.

Decision Document Summary

No text available