(1) EXTENSION TO THE REAR OF THE EXISTING BUILDING, (2) REMEDIAL WORKS TO THE FRONT AND LEFT SIDE WALL, (3) NEW WALLS TO THE SIDE, (4) NEW ROOF TO THE BUILDING, (5) NEW WINDOWS, (6) ANCILLARY WORKS TO THE SITE AND INSTALLATION OF A SEPTIC TANK