Core Refusal Reason
The application was refused due to a comprehensive lack of technical documentation, significant discrepancies in submitted drawings, and a design that fails to integrate with the historic architectural context or address public safety and environmental risks.
Decision Maker's Conclusion
- The application failed to provide critical technical assessments regarding flood risk, archaeological impact, and water infrastructure feasibility, making a full planning assessment impossible.
- The proposed design is considered incongruous with the established streetscape of New Ross, exhibiting excessive bulk and unsympathetic materials that do not respect the proximity of protected structures.
- The development would create a traffic hazard at Priory Lane and failed to demonstrate compliance with basic residential amenity standards, including Part V housing, drainage, and cycle storage.
Cited Policies (CDP)
Wexford County Development Plan 2022 - 2028Section 4.7.7 (Volume 1)Volume 2 Section 6.2.6Section 1.5.3 (Volume 2)Objective FRM 08Section 9.11.10 (Volume 1)Objective AH05 (Volume 1)
Decision Document Summary
The proposal involved the demolition of an existing warehouse (Block B) in New Ross Urban to facilitate a new development. Wexford County Council refused the application on ten grounds, primarily citing the poor quality and inconsistency of the submitted documentation. The Planning Authority determined that the development lacked essential environmental and heritage safeguards, failed to respond to the sensitive architectural grain of the area, and posed a risk to public safety through inadequat...SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.