SD25B/0203

1) External insulation to front and gable with smooth render finish. 2) Porch overhang to front. 3) Removal of window to front to incorporate increased entrance size and reduced window size to front. 4) Increased dormer size and modified design with parapet to gable end to rear. 5) All associated site works and drainage connections.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.