WEB1840/25

PERMISSION The development will consist of: (i) demolition and removal of existing temporary reefer gantry (c. 6m in height; c. 1.5m wide, c. 23.8m long northern section and c. 13m long southern section); (ii) installation of a new steel frame reefer gantry (c. 7.26m in height; c. 2m wide; c. 24.3m long northern section and c. 13.5m long southern section) with associated reinforced concrete pad foundations; and (iii) all ancillary site development works.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.

PDF Document Missing

The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.