257010
Extension of Duration for Planning Ref. No. 24/109: the change of house extension design previously granted (20/191) for the construction of a single storey rear extension to existing dwelling house, new site entrance, new main entrance with canopy, new waste water treatment plant and percolation area, energy efficiency upgrades including new double glazed windows, landscaping to side and rear and all ancillary site works
Refused
Core Refusal Reason
The application failed to meet the statutory requirements of Section 42 of the Planning and Development Act 2000 (as amended) because the development had not commenced and no substantial works had been carried out prior to the application for an extension of duration.
Decision Maker's Conclusion
- The development permitted under planning reference 20/191 has not yet commenced on-site, as confirmed by both the applicant and a site inspection.
- No substantial works have been carried out pursuant to the original permission, which is a mandatory requirement under Section 42(1)(a)(i) of the Planning and Development Act 2000 (as amended).
- The application fails to comply with the legal criteria necessary for the planning authority to grant an extension of the appropriate period for the permission.
Cited Policies (CDP)
Decision Document Summary
This application sought an extension of duration for a previously granted permission (Ref. 20/191) involving a house extension, new site entrance, and wastewater treatment system at Hollypark House, Ballysheedy, Limerick. Upon assessment and site inspection, the planning authority determined that the development had not yet commenced. The application was refused because it did not meet the statutory requirements of Section 42 of the Planning and Development Act 2000, which necessitates that subs...SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.