Core Refusal Reason
The application was refused due to the absence of a Natura Impact Statement (NIS) required to assess potential significant effects on the Malahide Estuary SAC and SPA, alongside a lack of critical technical information regarding lighting impacts and environmental screening.
Decision Maker's Conclusion
- The Planning Authority is legally precluded from granting permission under Article 6(3) of the Habitats Directive because the proposed designs constitute mitigation measures for protected European sites, necessitating a Natura Impact Statement (NIS) which was not provided.
- The applicant failed to submit a comprehensive lighting plan and calculation report to justify the development's impact on a 'High Amenity' zoned area and to demonstrate cumulative effects with existing site lighting.
- Insufficient environmental and visual data was provided, specifically regarding bird surveys for the Malahide Estuary and revised contiguous elevations showing the relationship between proposed and existing site infrastructure.
Cited Policies (CDP)
Decision Document Summary
The proposal sought permission for the installation of floodlights at Malahide Rugby Club on Estuary Road, a site characterized by its 'High Amenity' zoning and proximity to the Malahide Estuary. The application was refused primarily because the Planning Authority determined that the development could have significant effects on the Malahide Estuary Special Area of Conservation (SAC) and Special Protection Area (SPA), requiring a Natura Impact Statement that was not submitted. Additionally, the ...SOURCE PDFOpen Original