ED25/0102

1. Material change of use from a single dwelling to multi-occupancy institutional / Accommodation hub/hostel - type accommodation. 2 Two structures erected either side of the protected bridge adjacent of RPS 267 - as per SDCC Enforcement Officer Inspection. 3. Excavation of trenches and drainage works adjacent to the Owendoher River possibly linked to storm/foul connections. No confirmation of Irish Water Capacity for increased intensity of development. 4. Works to or adjacent to Protected Structures - bridge, railings, gates and walls ( RSP 267 ) debris falling into river. 5. Deposition of construction debris into the Owendoher River - no protection measures or run-off from works. 6. Removal of mature trees and Vegetation within the redline area of Rosebank but also on Council- owned zoned open space ( Willowbank Green ) outside the property boundary. No tree Protection measures deployed. 7. works within a hydrological zone known to contain otter habitats and known other watercourse and valuable spawning river for Dodder Catchment.

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.