Core Refusal Reason
The proposed wastewater percolation area fails to meet EPA standards due to the restricted width of the site, posing a risk to public health.
Decision Maker's Conclusion
- The restricted nature of the site prevents the dispersal field from achieving the necessary width for safe wastewater treatment.
- The proposed system fails to comply with the mandatory requirements of the EPA's 'Code of Practice Domestic Waste Water Treatment Systems (March 2021)'.
- The development would pose a significant risk to public health and fails to align with the principles of proper planning and sustainable development.
Cited Policies (CDP)
Section 12.10.3.1
Decision Document Summary
The proposal sought planning permission for the construction of a two-story development at Stonehaven House, Barnacullia, Dublin 18. The local authority refused the application because the site is too narrow to accommodate a wastewater dispersal field that complies with national environmental standards. Consequently, the development was deemed a risk to public health and found to be in breach of Section 12.10.3.1 of the County Development Plan 2022-2028....SOURCE PDFOpen Original