CONSTRUCTION OF 2 NO. PITCHED-ROOF DORMER WINDOWS TO MATCH EXISTING DORMER WINDOWS AT 2ND FLOOR / ROOF LEVEL ON THE FRONT (WEST) ELEVATION OF EXISTING HOTEL BUILDING