2306/21
PERMISSION & RETENTION: Permission and retention permission for development on lands at the site of the former engineering works which is located adjacent and west of the existing Milners Square residential development, Shanowen Road, Santry, Dublin 9. 1. The development will consist of permission for following works: (i) The reconfiguration of basement level to provide for a total of 174 car parking spaces and revisions to the bicycle and bin storage areas from details as previously granted under permission reference 4128/18. (ii) Provision of 20 no. electric vehicle charge points at basement level. (iii) Provision of revised basement storage areas for apartments from details as previously granted under permission reference 4128/18. (iv) The provision of a basement partition wall and screen to separate the basement car park associated with blocks A, B , C & D from the existing car park serving the Milners Square development. (v) Reconfiguration of the site layout at ground level to facilitate revisions to the site landscaping and play areas, revisions to the associated internal access road and turning heads along with revisions to the associated pedestrian walkways from details as granted under permission reference 4128/18. (vi) Permission for amendments to block D with omission of the roof garden from details as granted under permission reference 4128/18. 2. The development will consist of retention permission for the following works: (i) The retention of 2 no. balconies in apartment units C14 and C20 (block C). (ii) The retention of re-configured internal walls in block B, C and D to apartment units B1 – D44 (inclusive) with associated reconfiguration of the stair and lift layouts and associated amendments to the communal lobby window openings in Block D.
Decision Document Summary
No text availablePDF Document Missing
The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.