(1) DEMOLITION OF EXISTING DWELLING, (2) CONSTRUCTION OF A DWELLING WITH A SEPARATE DOMESTIC GARAGE AND (3) CONNECTION TO PROPOSED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER ALONG WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS