215372
The proposed development includes the provision of: 1. Up to 3 no. wind turbines with a maximum overall ground to blade tip height of up to 176.5 metres along with the associated foundations and hard-standing areas, serviced/accessed via the existing Carrigarierk Wind Farm infrastructure, permitted under An Bord Pleanála Planning References 04.246353 and 301563-18 ( Cork County Council Planning References 15/730 and 17/431); 2. An operational life of the proposed development aligned with that of the existing Carrigarierk Wind Farm (25 years from 2021); 3. Underground electrical (33kV) and communication cabling connecting the proposed turbines to the existing 110kV substation in the townland of Carrigdangan; 4. Upgrade of existing tracks and provision of new site access roads and hardstand areas; 5. 1 no. borrow pit; 6. A temporary construction compound; 7. Forestry felling; 8. Operational stage site signage; 9. Site drainage; and, 10. All associated site development works and apparatus. The application is accompanied by a Natura Impact Statement and Environmental Impact Assessment Report.
Core Planning Reasoning
The Inspector recommended granting permission because the development is consistent with national and regional renewable energy targets, complies with the Cork County Development Plan's strategy for wind energy, and will not significantly impact the environment or local amenities subject to mitigation and conditions.
Decision Maker's Conclusion
- The proposed development is acceptable in principle as it is situated within an area identified as 'open for consideration' for wind energy development in the current Cork County Development Plan 2022-2028.
- Following an Appropriate Assessment Stage 2, it is concluded that the proposal will not adversely affect the integrity of European designated sites, including the River Bandon SAC and The Gearagh SAC/SPA, provided mitigation measures are implemented.
- Residential and visual impacts, such as shadow flicker and noise, are found to be within acceptable limits or capable of being managed to a level that does not warrant a refusal of permission.