2140293

10 year planning permission for a 20kV overground and underground grid connection cable of c.1.26km in length (of which c.0.43 km is located in the administrative area of Cork County and 0.83 km is located in the administrative area of Cork City) to be provided on overhead poles and in excavated trenches and include associated underground ducting, joint bay and all associated site development and reinstatement works. The proposed grid connection cable will connect the solar farm substation permitted under Cork County Council planning reference 18/7410 (An Bord Pleanála reference 304045-19) which is now located within the administrative area of Cork City with the existing 110kV Coolroe substation. The works will be carried out within the solar farm boundary, on private lands and within the public road. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. The

Granted

Core Planning Reasoning

The proposed development is in accordance with national and regional policy objectives for renewable energy and, subject to compliance with conditions, would not seriously injure the visual or residential amenities of the area, would not negatively impact the road network, and would not increase flood risk.

Decision Maker's Conclusion

  • The grid connection is essential for the exportation of renewable energy from a permitted solar farm and supports the decarbonisation goals of the National Planning Framework and Climate Action Plan 2021.
  • The visual and residential impacts are considered localized and acceptable, specifically noting that the presence of existing 110kV overhead lines and mature tree screening mitigates the impact of new wooden poles.
  • Following an Appropriate Assessment, it was determined that the project would not adversely affect the integrity of the Cork Harbour SPA (Site Code 004030) provided that stated mitigation measures for water quality and bird safety are implemented.

Cited Policies (CDP)

Objective RCI 5-2Objective GI 8-1Objective GI 7-2Objective GI 7-3Cork County Development Plan 2014Article 13(1)(f) of the Planning and Development Regulations 2001Article 23(1)(f) of the Planning and Development Regulations 2001Schedule 5, Part 1, Class 20Schedule 7 of the Planning and Development Regulations 2001

Decision Document Summary

This report pertains to an appeal against the grant of permission for a 20kV grid connection in Garravagh, Inniscarra, intended to link a permitted solar farm to the Coolroe 110kV substation. The 1.26km route (830m of which is within Cork City jurisdiction) is primarily underground, with 10-14m high wooden poles used for crossing the R618 regional road and the River Lee. The site is located within the Cork Metropolitan Greenbelt and near a designated scenic route. Appellants raised concerns rega...