ED21/0056

Capping of the landfill will comprise reprofiling of the site with imported fill material and installation of a final landfill capping system consisting of: 150mm topsoil on 850mm subsoil on surface water drainage geocomposite on a geosynthetic clay liner (GCL) on a landfill gas geocomposite on the reprofiled landfill surface (Class 2 Fill). The works will also include the installation of a number of passive gas venting boreholes, a perimerter surface water drain, attenuation pond and outfall to the Dodder River. The Bohernabreena landfill consists of an area of approximately 2.7 hectares.

No decision recorded
Analysis not available for this case.