3424/21
The development consists of the provision of a new single storey canopy structure to the rear of the property to create a new outdoor dining & drinks terrace area at existing first floor level roof. Retractable glazed roof and sliding glazed screen to sides to allow use in different weather conditions. Provision for improved access by customers from ground to first floor level including new lobby and toilets to first floor landing and improved access to terrace area. Upgrade of existing rear return extension at first floor level with new façade and raised roof with compliant fire escape strategy head height requirements. Removal of the existing fire escape roof platform and escape ladder and provision for a new compliant emergency stair with existing final exit onto shared laneway to the rear. Removal of redundant & relocation of some existing roof mechanical & electrical services. Renovation & improvements of existing restrooms at ground floor level to provide compliant level access to a new wheelchair accessible WC. Provision for a new lobby for fire safety to stair landing. To include renovation, alterations to the existing building, including all associated site works.
Decision Document Summary
No text availablePDF Document Missing
The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.
Search for case on ABP