3482/21

Turner & Townsend Ltd. intends to apply for planning permission for development at this site at the former AIB Bank Centre, Serpentine Avenue, Ballsbridge, Dublin 4. The application site comprises Blocks E, G, H and F and surrounding landscaped areas. The proposed development comprises hard and soft landscaping works including the provision of seating, bollards, additional planters, external lighting, paving works and an exercise area (resulting in an amendment of DCC Reg. Ref. 3500/20). Additional proposals include revisions to the existing secure barrier and footpath arrangement adjacent to the south eastern entrance along Serpentine Avenue; additional vehicle and safety barriers within the site; the erection of a 2.4m timber fence set back within the site from the existing boundary onto Serpentine Avenue; a revised gate arrangement at the Block J entrance onto Serpentine Avenue; a roof light on an existing pop-up planter feature to the north of Block F; cladding to existing pop-up enclosures; the installation of a sun-screen within the existing atrium area located to the front of Block G; and all associated site development works above and below ground.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.

PDF Document Missing

The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.