SITE WORKS CONSISTING OF (1) RAISING THE GROUND LEVELS, WITH IMPORTED GRADED HARD FILL (2) CARRYING OUT RIVERBANK SOIL STABILISATION, BY THE REDUCTION OF CURRENT GROUND LEVELS BY CUTTING OF SLOPED EMBANKMENTS AND PLANTING WITH TREES AND SHRUBS