212142
the construction of (1) New Storage warehouse with canopy (2) Filling in of an existing fire water lagoon and replacing with a fire water tank and (3) Associated siteworks including palisade fencing and landscaping. Significant further information/revised plans submitted on this application
Granted
Core Planning Reasoning
The Board is not satisfied based on the information provided that the proposed water supply and surface water drainage arrangements are adequate to serve the development, potentially posing a risk to public health or causing water contamination.
Decision Maker's Conclusion
- The proposed upgrade to the wastewater treatment system to a tertiary level is acceptable in principle and would represent a planning gain compared to the existing setup.
- The anticipated increase of 20 HGV movements per day is not considered significant given the site's proximity to the regional road network and the proposed Travel Management Plan.
- Permission should be refused because the applicant failed to provide necessary information regarding the adequacy of the water supply and surface water drainage systems to cater for the proposed expansion.
Cited Policies (CDP)
INF OBJ 13Chapter 6 - Infrastructure Strategy
Decision Document Summary
This Inspector's Report is an addendum concerning a proposal by Mid Cork Pallets for a new storage warehouse, fire water tank, and associated works at an existing facility in Oranstown, Dunboyne, Co. Meath. Following a High Court order quashing a previous Board decision, the applicant submitted further information proposing to replace the existing 2001 wastewater system with a new tertiary treatment system compliant with EPA standards. While the Inspector found the wastewater proposals acceptabl...SOURCE PDFOpen Original