212178

the development will consist of 1. The construction of 12 no. 6m high walkway lighting columns around the perimeter of the pitch and 2 no. 15m high lighting columns in car-park 2. Removal of perimeter wall around pitch and construction of spectator fencing 3. Construction of retaining wall with spectator fencing to south and west embankment 4. 2 no. shelters 5. 3m wide walking track with drainage and all ancillary site works

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.