4003/21

Permission was granted on 12 February 2019 by An Bord Pleanala (Reg. Ref. 3353/18 and ABP-302507), for a period of 2 years to operate the conference centre at the Hotel subject to conditions relating to a) the use and opening hours of the conference centre and b) the noise level not to be exceeded from the conference centre. Condition three of the permission required the operation of the conference centre to be reviewed before February 2021. An application was submitted (Reg, Ref. 3229/20) before that date but was subsequently considered withdrawn by the Planning Authority. This application seeks to relodge that application and permission is now sought to continue to operate the centre subject to the remaining conditions in the permissions applying to the centre and without the need to repeatedly apply every 2 years.

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.

PDF Document Missing

The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.