2660423

1. the demolition of the original derelict stone Forge building and reconstruction to same dimensions in rendered blockwork with replacement metal roof. 2. removal of the chimney to the front of the original cottage. 3. partial demolition of the vehicular entrance and reconstruction with 3.5M wide opening. 4. 48sm single-storey timber outbuilding to the rear of the site. 5. the replacement of the existing septic tank with provision of a new waste-water treatment in accordance with Code of Practice EPA 202,

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.