(1) RETENTION OF EXISTING DWELLING, (2) CONSTRUCTION OF AN EXTENSION TO THE DWELLING HOUSE AND ALL ASSOCIATED WORKS WITH CONNECTION TO PROPOSED SEPTIC TANK PERCOLATION AREA ON SITE